Setilgest
  • About Us
  • Portfolio
  • Quality & Safety
  • Contacts
  • Recruitment
  • PT
Select Page

Arcelor Mittal (2010-2011)

Dismantling and erection of steelwork, structures, ducts and hydraulic piping of the existing blast furnace HF-2 at Sollac Mediterranée in Fos-sur-Mer - France.

Total Weight: 1.270 tons
Period of Execution: 7 months

Contacts

Other Projects

Air Liquide – SMR-X Project – Antwerp, Belgium (2019/2020)

Air Liquide – SMR-X Project – Antwerp, Belgium (2019/2020)

Galp Porto (2019)

Galp Porto (2019)

Galp Porto (2018) – Annual Shutdown (October)

Galp Porto (2018) – Annual Shutdown (October)

Air Liquide – Heracles Plant – Netherlands (2017)

Air Liquide – Heracles Plant – Netherlands (2017)

© Setilgest. Desenvolvido por NOS.

Contactos | Política de Privacidade