Air Liquide – Heracles Plant – Netherlands (2017)

Revamping of Flexicoker Unit at the Heracles Plant, in Rotterdam, the Netherlands:

  • Installation of static and rotating equipment;
  • Detail engineering, prefabrication and erection of structures, platforms and piping;
  • Installation of valves;
  • Painting and thermal insulation;
  • Electrical and instrumentation works;
  • Tests, commissioning and assistance to start-up.

Piping: 65 tons
Pipe welding: 7500 weld-inches (carbon, alloy and stainless steel)
Equipment: 91 tons
Estructures and platforms: 44,5 tons
Period of execution: 6 months

Privacy Preference Center

Close your account?

Your account will be closed and all data will be permanently deleted and cannot be recovered. Are you sure?