Amec Foster Wheeler Iberia (2015-2016) Detail engineering, fabrication, painting and internal lining of air ducts, flue gas ducts, stack, dampers, guillotines, structures and platforms for Naftan Refinery – Belarus. Total Weight: 395 tons Period of Execution: 6 months Contacts Other Projects Air Liquide – SMR-X Project – Antwerp, Belgium (2019/2020) Galp Porto (2019) Galp Porto (2018) – Annual Shutdown (October) Air Liquide – Heracles Plant – Netherlands (2017)