EDA Renováveis Açores (2016-2017)

Construction of new Geothermic Plant of Pico Alto, Ilha Terceira, Açores.

Scope included detail engineering and drawings, pre-fabrication and erection of water storage tank 500 m³, piping, installation of equipment (pumps, silencers, etc…), electrical and instrument works.

Total Weight: 550 tons
Period of Execution: 10 months