Onquest Inc (2014-2015)

Detail engineering, fabrication of steelwork and coils, installation of refractory lining and modularization of three Waste Heat Recovery Units, including flue gas ducts and stacks for BP – Shah Deniz 2 in Azerbaijan.

Total Weight: 405 tons
Period of Execution: 8 months

Contacts
Azerbaijan 01-25-16-1
Azerbaijan 01-25-16-2
DSC09347
_MG_4094
_MG_4093
IMG_3683
IMG_3799
DSC03771
IMG_3989
DSC03764
DSC03763
DSC03768
Azerbaijan 01-25-16-1
Azerbaijan 01-25-16-2
DSC09347
_MG_4094
_MG_4093
IMG_3683
IMG_3799
DSC03771
IMG_3989
DSC03764
DSC03763
DSC03768

Other Projects

Galp Porto (2019)

Galp Porto (2019)

Galp Porto (2018) – Annual Shutdown (October)

Galp Porto (2018) – Annual Shutdown (October)

Air Liquide – Heracles Plant – Netherlands (2017)

Air Liquide – Heracles Plant – Netherlands (2017)

EDA Renováveis Açores (2016-2017)

EDA Renováveis Açores (2016-2017)

© Setilgest. Developed by NOS.

Contacts | Privacy Policy