Arcelor Mittal (2010-2011) Dismantling and erection of steelwork, structures, ducts and hydraulic piping of the existing blast furnace HF-2 at Sollac Mediterranée in Fos-sur-Mer – France. Total Weight: 1.270 tons Period of Execution: 7 months Contacts Other Projects Air Liquide – SMR-X Project – Antwerp, Belgium (2019/2020) Galp Porto (2019) Galp Porto (2018) – Annual Shutdown (October) Air Liquide – Heracles Plant – Netherlands (2017)