EDA Renováveis Açores (2016-2017)

EDA Renováveis Açores (2016-2017)

EDA Renováveis Açores (2016-2017) Construction of new Geothermic Plant of Pico Alto, Ilha Terceira, Açores. Scope included detail engineering and drawings, pre-fabrication and erection of water storage tank 500 m³, piping, installation of equipment (pumps, silencers,...
Onquest Inc (2014-2015)

Onquest Inc (2014-2015)

Onquest Inc (2014-2015) Detail engineering, fabrication of steelwork and coils, installation of refractory lining and modularization of three Waste Heat Recovery Units, including flue gas ducts and stacks for BP - Shah Deniz 2 in Azerbaijan. Total Weight: 405 tons...
Technip Benelux (2014)

Technip Benelux (2014)

Technip Benelux (2014) Complete replacement of convection modules, radiant coils and crossovers, refractory and external insulation, as well as ducts, platforms and structures of two Recycle Gas furnaces, 7A and 7B at Shell Wesseling Refinery, Germany. Total Weight:...
Lurgi Air Liquide (2013-2014)

Lurgi Air Liquide (2013-2014)

Lurgi Air Liquide (2013-2014) Construction of a new HYCO plant for Bayer in Chempark - Dormagen, Germany. Erection of one Hydrogen Reformer, cold boxes, modules, compressors, pumps, vessels, other equipment, steelstructures, piperacks and miscellanea. Fabrication and...